I am following this blog for quite some time and found the member community quite helpful .
Now I am planning to start the house construction in our 30*50 sqft .To start with Below things are finalized
1.Plan from Architect - G+2 structure for self purpose( approx 3400 sqft)
2.Hired a labour contractor ,(actually he is a civil engineer where he has a team of laborers) .Quoted 258 Per sft excluding Retaining wall and sump water proofing
Some Challenges in the site as I can see
1) Open drain just behind the site .(its east facing site.In West ,the Drain flows from north to South )
2) Water for construction as we are not opting for Bore as water table is very low in this area.
Now below are some of my queries to start with (currently my mind is messy with many questions in all directions,I think its normal as its not my field of expertise)..Feels kind of fresher who is starting off a job /project

1.I have an estimation from architect an approx 1500 per sqft to complete my construction with medium quality fittings.Is that Reasonable and achievable as I am opting for labour contractor and I have control over material sourcing ..However my point is structure construction should not be comprised ,later some interiors and other fittings can be chosen for medium quality ..
2.As in civil work,I am opting for concrete blocks over red bricks and Ready mix over manual mix ..sump will be done as rcc vs red brick
Is the decisions contribute to good quality of structure or any issues for building quality ??
3.As this is Labour contract .What are pitfalls I need to watch out ?
Please guide me
Thanks in advance