Guys, Today we did roofing and as you all know it's with RMC.
Here are some details and pics for you to comment on.
# Concrete Grade is M20 ( what is ordered by my builder) Not sure what is actual grade arrived at site, no test cube made to ascertain, when asked for the same no proper answer from the writer or JE ,who were at the site.
# thickness of roof 5.5" and they keep measuring it regularly with some simple technique. A bonding wire tied to a 8mm rod at 5.5''.
# pumping machine and guys arrived at 5.30 am, did set up by 6.00 am ,concrete arrived at around 7.00am in three transit mixers. started pouring with in 10 mints of its arrival. it,s all over by 8.30 AM.Concrete use is around 16 cubic meters.
# vibrator is used at beams and pillars extensively and lightly at other plain roof surface.
# Police promptly arrived,and you can guess what happens next.
# Human resource present at the site as follows.
Senior Engineer ( over seeing the whole process)
Junior Engineer ( checking everything in detail and guiding them constantly)
Mastery ( two numbers, brothers, one guiding his staff and other overseeing and guiding the shuttering fellows )
Writer ( ensuring the pump and transit mixer arrives in time and he took care of police also, you know what i mean)
Mastery assistants six persons, who were spreading , filling and leveling it .and also using vibrator now and then.
Shuttering guys two persons: I think they were the busiest of the all, doing continuously adjustments,as concrete poured and vibrator used they need tighten the shuttering supports.
Electrician : one person, he is there to make sure electrical conduits and other fittings are intact and in place with no damage or breakage while concreteing .
Pesonnel from RMC company totally around 8 ,doing their work routinely, pumping the concrete ,stopping it when told, adding water when told , removing the supply pipes and adjusting them as work progresses.
Last but not least me and my son watching the whole show,it's a nice experience to us as this was our first construction project.
# the final step is ,we served good and full breakfast to all the workers, and i think that gave us more satisfaction and happiness than anything else.
OMG, let me stop, people don't have time and patience to read so much