Typical cost apportionment upto super structure
Posted: April 5th, 2014, 9:31 am
Dear Forum members,
Presently, I have finished super structure (i.e upto mouldings ) for G+2 house, but I am not able ascertain the total construction cost including finishing. I would like know the typical cost apportionment upto super structure construction for G+2 house. you can assume finishing materials will be of medium range(tiles for flooring, honne shutters for windows, tractor emulsion paint, MS railing for stair case etc).
with thanks....
Basha
Presently, I have finished super structure (i.e upto mouldings ) for G+2 house, but I am not able ascertain the total construction cost including finishing. I would like know the typical cost apportionment upto super structure construction for G+2 house. you can assume finishing materials will be of medium range(tiles for flooring, honne shutters for windows, tractor emulsion paint, MS railing for stair case etc).
with thanks....
Basha