What are the plumbing charges? BWSSB Charges?
Posted: November 8th, 2009, 11:29 am
Hey, I am noticing that one of the most expensive lot in the construction is plumbing (water + sanitary). If you have 3-4 bathrooms, the pipes (and accessories) would cost 50k, labour of around 40k, fittings (commode, washbasin, tiles taps etc) ~ 30k, BWSSB charges / approvals etc = that is easily 2-3 lakhs approximately. During estimations, this is understated & we do not give enough considerations for this. We can buy a tap which costs 1k or 10k or a commode for 5k or 25k & hence its only limited on your budget & have a huge variance in the cost.
Was wondering if someone can give an idea here (for every 1's benefit) on the costs involved? I have given my inputs (from what I have heard)
Charges by Plumber:
1. 2 bathrooms + sump + water tank configuration:
----- GI Pipes (Tata pipes) : 7-8K per bathroom (cold water, solar line, heater line) + extra 5-8k for water tank etc : 2 * 8K + 8k = 24-25K
----- PVC Pipes (blue, green, white): 50% of the above cost because work involved is easy = 15k (true?)
2. Bath fittings:
--- Stop valves & Angle corks (3 - 5 depending on the plumbing options) - 3k + taps/mixer - 3k + showerhead & hand shower - 2k + commode - 5k + washbasin - 3k + wall tiles (cheapest kinds 25rs/sft) 7k + flooring(40rs/sft?) 3k (with a normal 6x8 size bath) + laying charges 3-4k : 30K approximately (or more?)
3. Govt approvals & charges:
--- How much does this cost? Is there any calculation for this?
--- New meter connection
--- New Sewage line connection (optional if it already exists for lower floor house)
--- official charges?
--- unofficial grants to make things happen?
Can someone give a view on the govt charges involved? (bullet 3) : how is this computed?
(Pl. update the values put above so that it would help everyone).
Was wondering if someone can give an idea here (for every 1's benefit) on the costs involved? I have given my inputs (from what I have heard)
Charges by Plumber:
1. 2 bathrooms + sump + water tank configuration:
----- GI Pipes (Tata pipes) : 7-8K per bathroom (cold water, solar line, heater line) + extra 5-8k for water tank etc : 2 * 8K + 8k = 24-25K
----- PVC Pipes (blue, green, white): 50% of the above cost because work involved is easy = 15k (true?)
2. Bath fittings:
--- Stop valves & Angle corks (3 - 5 depending on the plumbing options) - 3k + taps/mixer - 3k + showerhead & hand shower - 2k + commode - 5k + washbasin - 3k + wall tiles (cheapest kinds 25rs/sft) 7k + flooring(40rs/sft?) 3k (with a normal 6x8 size bath) + laying charges 3-4k : 30K approximately (or more?)
3. Govt approvals & charges:
--- How much does this cost? Is there any calculation for this?
--- New meter connection
--- New Sewage line connection (optional if it already exists for lower floor house)
--- official charges?
--- unofficial grants to make things happen?
Can someone give a view on the govt charges involved? (bullet 3) : how is this computed?
(Pl. update the values put above so that it would help everyone).