Re: House Construction Experiance
Posted: June 3rd, 2016, 5:09 pm
Anil,
Very nice going. Thanks for sharing the pictures. clearly Shows us different stages in construction of a house . I went through the material spec posted by you. As far i'm aware, you are currently using ultratech. what is the reason for changing the cement ?
"mestri insisting to use either Birla or ACC as he is not satisfied with the quality of the cement " .
What does the maestri mean by quality of cement is not good. Is he refering to setting time ? . check the manufacturing date of the cement that your contractor is using. Generally cement should be consumed with in 90 days from the manufactured date else it has to be tested for compressive strength. This is what is told in ultratech website
Regards
pradeep
Very nice going. Thanks for sharing the pictures. clearly Shows us different stages in construction of a house . I went through the material spec posted by you. As far i'm aware, you are currently using ultratech. what is the reason for changing the cement ?
"mestri insisting to use either Birla or ACC as he is not satisfied with the quality of the cement " .
What does the maestri mean by quality of cement is not good. Is he refering to setting time ? . check the manufacturing date of the cement that your contractor is using. Generally cement should be consumed with in 90 days from the manufactured date else it has to be tested for compressive strength. This is what is told in ultratech website
Regards
pradeep