Owners of Anjanapura layout

nsharab
Posts: 54
Joined: January 20th, 2013, 8:56 pm

Re: Owners of Anjanapura layout

Post by nsharab »

Appreciate your efforts. Lets all gather and make this appointment fruitful.
AFERWA
Posts: 7
Joined: April 30th, 2014, 1:54 am

Re: Owners of Anjanapura layout

Post by AFERWA »

Dear Anjanapura BDA layout Residents and site owners,

It gives us immense pleasure to cordially invite on the occasion of foundation stone laying ceremony for the Construction of 11MLD GLR and laying of water distribution pipelines (for permanent cauvery water supply from BDA & BWSSB).

The chief guest for the occasion is our honourable M.P. (Bangalore Rural) Mr. D.K.Suresh. Other important dignitaries includes our M.L.A Mr. Krishnappa, Our corporator (Anjanapura ward) Shri Gangadhar. We are great full and our special thanks to our honourable M.P. who have helped us in making our dream come true. We also cannot undermine the tremendous effort put by MLA Krishnappa and Corporator Shri Gangadhar.

At last but not least, we also thank to all the members of AFERWA and other associations and all the members who have helped us in achieving this.

So, please be present on the historic occasion along with your family and friends to witness the much awaited event.
Please find the attached invite and Ceremony details:

Venue: 11th Block behind Saneswara Temple(Near AFERWA Meeting place)
Timing: 9:00 AM, 8th MArch 2015.(Sunday).
Contact #: 9731009343.

NOTE: Breakfast is arranged for all the guests.
Attachments
Invitation  .
Invitation .
aferwa Invitation.pdf
Invitation
(682.8 KiB) Downloaded 728 times
Suresh Anna
Suresh Anna
AFERWA__2.jpg (209.66 KiB) Viewed 13998 times
agurushiddappa
Posts: 4
Joined: July 21st, 2012, 2:53 pm

Re: Owners of Anjanapura layout

Post by agurushiddappa »

Hello Friends,
What is the current per sq ft rate in 2nd block?
Thanks
Guru
gowda_sree
Posts: 104
Joined: September 20th, 2011, 10:07 pm

Re: Owners of Anjanapura layout

Post by gowda_sree »

FreeMedicalCamp-24May.pdf
AFERWA Free Health checkup camp
(259.35 KiB) Downloaded 773 times
Dear All,

AFERWA has organised FREE HEALTH CHECKUP CAMP for all its residents. We request all of you to make use of this and make this grand success. Please find attached invitation for the same.

Thanks,
Sree Gowda.
gowda_sree
Posts: 104
Joined: September 20th, 2011, 10:07 pm

Re: Owners of Anjanapura layout

Post by gowda_sree »

Dear all Anjanapura Further Extension Residents and Site Owners,

As part of the AFERWA's (Anjanapura Further Extension Residents Welfare Association) regular efforts to get amenities for Anajanpura Further Extension (9-11th Block), we are meeting BWSSB Chairman on 16ht Jun 2015, to pressurize to call a tendor for Under Ground Drainage (UGD) work for 9-11th Block. BDA has deposited Rs. 5 Crore out of 36 Crore as an advance to call for Tender and execute a Project of about 36 Crore Project. But still nothing is getting materialized by BWSSB side.

We have met our honorable MP Mr. D.K. Suresh today and Mr. DKS as assured to accompany us to BWSSB office to discuss about this Project status. This is again another great help and support, we are getting from our Respectable MP Mr. DKS towards Anjanpura Further Extension development.

The Cauvery GLR work is under progress but not at the pace of what it supposed to be due to many more internal issues of BDA and BWSSB. This is also another agenda, whcih will be discussed with BWSSB in the presence of MP Mr. DK Suresh.

We request people present @ Cauvery Bhavan on 16th Jun by 11:30am.

Thanks,
Sree Gowda
(Team AFERWA)
mmindian
Posts: 143
Joined: December 19th, 2013, 10:54 pm

Re: Owners of Anjanapura layout

Post by mmindian »

Dear All,
It gives me Immense pleasure and happiness in conveying one and all That after 2 months daily follow up every alternate day ,we have been successful in getting Rs 3 CRORE + RS 5 crore = Rs 8 Crore for Implementation of WATER PIPELINE And GLR,our heart full thanks to our Hon'ble M.P.SHRI .D.K.SURESH Anna ,who called up BDA commissioner many times since 2 months of our follow up and finally BDA paid Rs 8 crore as Initial deposit for the same,

Now ,Latest development in UNDER GROUND DRAINAGE is After Intervention of Our HON'ble M.P.Shri,D.K.SURESH Anna And our meeting with BDA Commissioner MR.SHAM BHATT yesterday ,Rs 5 crore has been sanctioned for UNDERGROUND DRAINAGE(UGD) AND STP for All Blocks of ANJANAPURA,

Now BWSSB shall Henceforth call for UGD AND STP tender ,Finally our association has made it a Dream come True , It has taken a lot of hard work since few months FROM OUR ASSOCIATION following the DPR and handing over to BDA ,getting DPR sanctioned in BDA BOARD MEETING and Now ALLOCATION OF ADVANCE PAYMENT from Our ASSOCIATION ,

After Floating of pipeline tender and starting of pipeline and GLR construction work ,There has not been any development work happening in ANJANAPURA BDA LAYOUT,We have Just not given letters and requested but We have done lot of GROUND work physically running almost every alternate day and getting papers moved from BWSSB TO BDA And Again BDA TO BWSSB , If Some one needs a Justification to this we shall surely take them to the BDA Commissioner and BWSSB CHAIRMAN to Clear their clarifications ,

Further ,Yesterday we handed over a Letter keeping in view of all problems in ANJANAPURA 1 TO 11 BLOCKS ,And Happy that our BDA Commissioner has accepted for 1.Immediate action on 80 ft road shall be considered,
2.Cleaning of Parks ,and development of New Parks ,
3.Naming of Cross roads and Streets,
4.LED street Lights Problems ,
AND various other Issues,

we thank one and all present in yesterday meeting ,There shall be again a Meeting with OFFICIALS in short while from now ,The date shall be mentioned ,Request one and all to join and come out with your complain ,suggestions and grievances if any ,

Also FROM NOW ON WE WELCOME VOLUNTARY DONATIONS to our Association ,YOUR EVERY SINGLE PAISE DONATED SHALL BE ACCOUNTED AND Transparency system shall be maintained for all expenditures of it ,

Thanks
REGARDS,
For LBSNRWA,

MOHAMMED MUEEN,
PRESIDENT.
9886106199.
gowda_sree
Posts: 104
Joined: September 20th, 2011, 10:07 pm

Re: Owners of Anjanapura layout

Post by gowda_sree »

To All AFERWA (9-11th Block of Anjanapura Layout) Members,

Team AFERWA has met BWSSB chairman on 16th Jun @ 12:30pm Cauvery Bhavan along with honorable MP Mr. DK Suresh. Frist of our sincere thanks to Mr. DKS for his remarkable help and support towards Anjanapura Further extension developmental works.

MOM of meeting is like below,

People present: BWSSB Chairman (Mr. Anjum Pervez), Mr. DK Suresh (Honorable MP Bangalore South) Team AFERWA (Sree Gowda, Prabhakar, Munivenkatappa, Sampath Kumar, Kumar, Murugan, Sudhir and many more) & Mueen

1. Reviewed the current BWSSB work progress of the GLR and Water supply lanes work happening for 9-11th Blocks.
2. AFERWA was specific about UGD project status for 9-11th blocks and raised about its tender process status. Mr. Pervez stated we have not received neither a payment towards 9-11th blocks UGD projects from BDA nor a letter from BDA. The released money (Rs. 8 Crore) was towards bill payment for Contractor for the work which he already carried out like GLR and Water lane laying @ 9-11th blocks.
3. MR. MP & BWSSB Chairman had called BDA commissioner Mr. Shyam Bhat over telephone and asked about budget allocation status towards Rs. 27 Crore UGD project for 9-11th Blocks (only for Anjanapura Further Extension). BWSSB Chairman wanted payment at least of Rs. 5 crore for Cauvery water supply and Rs. 5 crore for Further extension UGD works to starts it tender process. Mr. Bhat expressed to arrange for Rs. 5 crore due to shortage of funds in BDA. Mr. MP has told commissioner, now AFERWA team will come and meet you about this.

4. After the call Mr. MP & Mr. Pervez advised to AFWERVA team to get Rs. 5 crore along with a enclosed letter from BDA stating that the amount is towards specific to Anjaanpura Further extension UGD project. Then only we will be able to call tender.

5. As per honorable MP direction, team AFERWA immediately called BDA commissioner secretary and got an appointment to meet Mr. Bhat about Anjanapura Further Extension UGD Project.

6. Team AFERWA met BDA commissioner at around 1:40pm to 2pm on same day and explained and requested to provide a covering letter towards UGD project for along with payment of Rs. 5crore.

7. Mr. Commissioner immediately had a call with BDA's Finance member and directed them to release Rs. 5 crore and provide a covering letter stating as towards Anjanapura UGD project only and to proceed with its related tender process. Since, Finance Member was already out of Office we were advised to go and meet BDA's Chief Account Officer (CAO) to get this materialized.

8. Team AFERWA rushed to CAO's chamber and explained all, CAO has called Finance Member and get confirmed about Rs. 5 crore payment release Further extension UGD project. After this, CAO called BDA South Executive Engineer to send Anjanapura Further Extension UGD file to Accounts section since they want to proceed with payment to BWSSB adn EE has agreed for the same.

The above actions were happened with the initiative of Team AFERWA's continuous efforts and support of honorable MP. Mr. DKS.

Team AFERWA is following up Water supply and UGD projects from more than 7 years. It was beginning from getting the land for GLR in 2011, following and getting the DPR done 2013 and many more.

We require many Anjanapura residents and site owner support to continue and complete remaining developmental works. Please come and join us and mail to aferwa.org@gmail.com


We are also grateful to Mr. Suresh for kind support all the time.

Thanks,
Team AFERWA
Attachments
BWSSB meet1
BWSSB meet1
BWSSB meet2
BWSSB meet2
mmindian
Posts: 143
Joined: December 19th, 2013, 10:54 pm

Re: Owners of Anjanapura layout

Post by mmindian »

Dear All,

There has not been any development work happening in ANJANAPURA BDA LAYOUT,We have Just not given letters and requested but We have done lot of GROUND work physically running almost every alternate day and getting papers moved from BWSSB TO BDA And Again BDA TO BWSSB , If Some one needs a Justification to this we shall surely take them to the BDA Commissioner and BWSSB CHAIRMAN to Clear their clarifications ,

WATER PIPELINE TENDER AND GLR CONSTRUCTION PAYMENT FOLLOW UP TO GET RS 8 CRORE RELEASED Was not a easy job ,Inspite of BWSSB chairman ,BWSSB Chief Engineer Projects request the BDA had not paid,Later I had taken the issue to Hon'ble M.P.Shri .D.K.Suresh Anna ,Only after his phone call to BDA Commisioner and everyday follow up since almost 2 months we were successful in getting APPROVAL FOR FLOATING UGD AND STP FOR ALL BLOCKS ANAJANAPURA TENDER BY BWSSB,

The Finance Member had already stated that Rs 5 crore shall be given in a week time during our follow up last week for which he has released now ,
also during Tuesday Meeting after our Hon'ble MP shri D.K.SURESH ANNA spoke along with BWSSB chairmain to the BDA commissioner ,after which the payment was agreed ,
Our Hon'ble MP shri D,K.SURESH ANNA had told to release RS 5 CRORE FOR UGD AND STP and Rs 5 crore for The ongoing water pipeline project ,

But BDA has just released Rs 5 crore ,we will follow up for another Rs 5 crore to be given at the earliest,

LBSNRWA has DONE LOT OF PRELIMINARY GROUND WORK TO GET UGD AND STP tender happen ,Right from following up with DPR Which was rejected by the EM (BDA CHIEF ENGINEER )MR.NAYAK due to non availability of proper SEWAGE TREATMENT PLANT DRAWING in October last year 2014,Later in JANUARY 2015 STP drawing was again prepared by BWSSB and handed over to BDA , After our daily follow up with BDA Commissioner The matter was taken in board in FEBRUARY 2015,
Finally the UGD and STP got approval from BDA BOARD MEETING ,

After the Matter was passed in BDA BOARD MEETING , BWSSB STRICTLY DENIED THAT THEY SHALL NOT CALL FOR UGD AND STP TENDER UNLESS THEY GET WATER PIPELINE AMOUNT ,AGAIN FROM MARCH 2015 ,WE STARTED FOLLOWING UP WITH BDA COMMISSIONER AND FINANCE MEMBER ,THE FINANCE MEMBER,BDA, told that they are in shortage of funds and every week they told the same Reason ,In May 2015 Our Hon'ble M.P.SHRI D.K.SURESH ANNA intervened and instructed BDA commissioner to release Payment for ON GOING water pipeline and GLR construction project in ANJANAPURA ,First part payment of Rs 3 crore was given ,Then after EVERY ALTERNATE DAY FOLLOW UP ALMOST ONE MONTH LATER Rs 5 crore was released with a Promise that this week Rs 5 crore shall be released to BWSSB ,WE HAD A FOLLOW UP ALMOST EVERY ALTERNATE DAY ,but did not post anything here for the reason being very simple ,....."SUCCESS HAS MANY FATHERS , FAILURE IS AN ORPHAN",.....ONLY GOD AND PEOPLE WHO SEEN LBSNRWA work know the fact,

BWSSB CHAIRMAN HIMSELF HAS PRAISED THE FOLLOW UP OF LBSNRWA IN GETTING RS 8 CRORE REMITTED FROM BDA TO BWSSB ,

Regards,
MUEEN,
LBSNRWA ,
PRESIDENT,
gowda_sree
Posts: 104
Joined: September 20th, 2011, 10:07 pm

Re: Owners of Anjanapura layout

Post by gowda_sree »

To All AFERWA (9-11th Block of Anjanapura Layout) Members,

Team AFERWA has met BWSSB chairman on 16th Jun @ 12:30pm Cauvery Bhavan along with honorable MP Mr. DK Suresh. Frist of our sincere thanks to Mr. DKS for his remarkable help and support towards Anjanapura Further extension developmental works.

MOM of meeting is like below,

People present: BWSSB Chairman (Mr. Anjum Pervez), Mr. DK Suresh (Honorable MP Bangalore South) Team AFERWA (Sree Gowda, Prabhakar, Munivenkatappa, Sampath Kumar, Kumar, Murugan, Sudhir and many more) & Mueen

1. Reviewed the current BWSSB work progress of the GLR and Water supply lanes work happening for 9-11th Blocks.
2. AFERWA was specific about UGD project status for 9-11th blocks and raised about its tender process status. Mr. Pervez stated we have not received neither a payment towards 9-11th blocks UGD projects from BDA nor a letter from BDA. The released money (Rs. 8 Crore) was towards bill payment for Contractor for the work which he already carried out like GLR and Water lane laying @ 9-11th blocks.
3. MR. MP & BWSSB Chairman had called BDA commissioner Mr. Shyam Bhat over telephone and asked about budget allocation status towards Rs. 27 Crore UGD project for 9-11th Blocks (only for Anjanapura Further Extension). BWSSB Chairman wanted payment at least of Rs. 5 crore for Cauvery water supply and Rs. 5 crore for Further extension UGD works to starts it tender process. Mr. Bhat expressed to arrange for Rs. 5 crore due to shortage of funds in BDA. Mr. MP has told commissioner, now AFERWA team will come and meet you about this.

4. After the call Mr. MP & Mr. Pervez advised to AFWERVA team to get Rs. 5 crore along with a enclosed letter from BDA stating that the amount is towards specific to Anjaanpura Further extension UGD project. Then only we will be able to call tender.

5. As per honorable MP direction, team AFERWA immediately called BDA commissioner secretary and got an appointment to meet Mr. Bhat about Anjanapura Further Extension UGD Project.

6. Team AFERWA met BDA commissioner at around 1:40pm to 2pm on same day and explained and requested to provide a covering letter towards UGD project for along with payment of Rs. 5crore.

7. Mr. Commissioner immediately had a call with BDA's Finance member and directed them to release Rs. 5 crore and provide a covering letter stating as towards Anjanapura UGD project only and to proceed with its related tender process. Since, Finance Member was already out of Office we were advised to go and meet BDA's Chief Account Officer (CAO) to get this materialized.

8. Team AFERWA rushed to CAO's chamber and explained all, CAO has called Finance Member and get confirmed about Rs. 5 crore payment release Further extension UGD project. After this, CAO called BDA South Executive Engineer to send Anjanapura Further Extension UGD file to Accounts section since they want to proceed with payment to BWSSB adn EE has agreed for the same.

The above actions were happened with the initiative of Team AFERWA's continuous efforts and support of honorable MP. Mr. DKS.

Team AFERWA is following up Water supply and UGD projects from more than 7 years. It was beginning from getting the land for GLR in 2011, following and getting the DPR done 2013 and many more.

We require many Anjanapura residents and site owner support to continue and complete remaining developmental works. Please come and join us and mail to aferwa.org@gmail.com


We are also grateful to Mr. Suresh for kind support all the time.

Thanks,
Team AFERWA
mmindian
Posts: 143
Joined: December 19th, 2013, 10:54 pm

Re: Owners of Anjanapura layout

Post by mmindian »

Dear All,

There has not been any development work happening in ANJANAPURA BDA LAYOUT,We have Just not given letters and requested but We have done lot of GROUND work physically running almost every alternate day and getting papers moved from BWSSB TO BDA And Again BDA TO BWSSB , If Some one needs a Justification to this we shall surely take them to the BDA Commissioner and BWSSB CHAIRMAN to Clear their clarifications ,

WATER PIPELINE TENDER AND GLR CONSTRUCTION PAYMENT FOLLOW UP TO GET RS 8 CRORE RELEASED Was not a easy job ,Inspite of BWSSB chairman ,BWSSB Chief Engineer Projects request the BDA had not paid,Later I had taken the issue to Hon'ble M.P.Shri .D.K.Suresh Anna ,Only after his phone call to BDA Commisioner and everyday follow up since almost 2 months we were successful in getting APPROVAL FOR FLOATING UGD AND STP FOR ALL BLOCKS ANAJANAPURA TENDER BY BWSSB,

The Finance Member had already stated that Rs 5 crore shall be given in a week time during our follow up last week for which he has released now ,
also during Tuesday Meeting after our Hon'ble MP shri D.K.SURESH ANNA spoke along with BWSSB chairmain to the BDA commissioner ,after which the payment was agreed ,
Our Hon'ble MP shri D,K.SURESH ANNA had told to release RS 5 CRORE FOR UGD AND STP and Rs 5 crore for The ongoing water pipeline project ,

But BDA has just released Rs 5 crore ,we will follow up for another Rs 5 crore to be given at the earliest,

LBSNRWA has DONE LOT OF PRELIMINARY GROUND WORK TO GET UGD AND STP tender happen ,Right from following up with DPR Which was rejected by the EM (BDA CHIEF ENGINEER )MR.NAYAK due to non availability of proper SEWAGE TREATMENT PLANT DRAWING in October last year 2014,Later in JANUARY 2015 STP drawing was again prepared by BWSSB and handed over to BDA , After our daily follow up with BDA Commissioner The matter was taken in board in FEBRUARY 2015,
Finally the UGD and STP got approval from BDA BOARD MEETING ,

After the Matter was passed in BDA BOARD MEETING , BWSSB STRICTLY DENIED THAT THEY SHALL NOT CALL FOR UGD AND STP TENDER UNLESS THEY GET WATER PIPELINE AMOUNT ,AGAIN FROM MARCH 2015 ,WE STARTED FOLLOWING UP WITH BDA COMMISSIONER AND FINANCE MEMBER ,THE FINANCE MEMBER,BDA, told that they are in shortage of funds and every week they told the same Reason ,In May 2015 Our Hon'ble M.P.SHRI D.K.SURESH ANNA intervened and instructed BDA commissioner to release Payment for ON GOING water pipeline and GLR construction project in ANJANAPURA ,First part payment of Rs 3 crore was given ,Then after EVERY ALTERNATE DAY FOLLOW UP ALMOST ONE MONTH LATER Rs 5 crore was released with a Promise that this week Rs 5 crore shall be released to BWSSB ,WE HAD A FOLLOW UP ALMOST EVERY ALTERNATE DAY ,but did not post anything here for the reason being very simple ,....."SUCCESS HAS MANY FATHERS , FAILURE IS AN ORPHAN",.....ONLY GOD AND PEOPLE WHO SEEN LBSNRWA work know the fact,

BWSSB CHAIRMAN HIMSELF HAS PRAISED THE FOLLOW UP OF LBSNRWA IN GETTING RS 8 CRORE REMITTED FROM BDA TO BWSSB ,

Without Our Hon'ble MP Shri .D.K.SURESH anna support ANAJANAPURA BDA LAYOUT WOULD NOT HAVE SEEN CHANGES WHAT IS HAPPENING NOW ,,,

Regards,
MUEEN,
LBSNRWA ,
PRESIDENT,