Please review: Plumbing Quotation
-
- Posts: 21
- Joined: February 28th, 2014, 11:21 am
Please review: Plumbing Quotation
Dear All,
Please help me with your input on the points that I can negotiate. This is for a full material contract including pipes, masonry for concelaed tank etc and excluding the final fittings and fixtures (such as WC, Wash basin, taps etc which has to be bought by me). This is for my upcoming house on 30x50 site with 5 bathrooms + 1 Kitchen. No borewell.
If you do have any reliable contacts for Plumbing, please do let me know.
Appreciate your inputs on this as this will help me decide on reasonable rates for this work.
Sl No. Description Unit Rate Amount
1 Supplying and fixing of CPVC pipes including all CPVC fittings like
Tees,Bends,unions,coupling,Reducers etc. Cutting, jointing with solvent
and pressure testing the joints and pipeline.
A)20mm 600 Rft 80 48000
B)25mm 700 Rft 90 63000
2. Supplying and fixing 1 CPVC ball valves with knob operated
A)20mm 4 Nos 450 1800
B)25mm 8 Nos 650 5200
3. Supplying and fixing of PVC soil waste and vent pipe and PVC fittings
A)75mm 140 Rft 120 16800
B)110mm 320 Rft 170 54400
4. Supplying and fixing of PVC nahni trap in concrete 22 Nos 450 9900
5. Fixing CP grating with rim 22 Nos 100 2200
6. Fixing geysers including the cost of making holes, required bolts 5 Nos 750 3750
and nuts with washers
7. Fixing wall mounted water closet with concealed Tank, 5 Nos 2500 12500
construction of brick masonry work and finishing
8. Hot and cold shower point providing and fixing mixer unit and 5 Nos 1250 7500
overhead shower
9. Fixing paper holder, soap dish. CP towel rack and others 15 Nos 100 1500
10. Making core cutting in RCC beams and slabs 15 Nos 600 9000
11. Concrete covering for PVC pipes in Bathrooms 90 cft 130 11700
12. Solar connection 1 No 2000 2000
13. Fixing Sump pump 1 No 2000 2000
14. Sintex tank fixing 1 No 2500 2500
15. Kitchen taps fixing 1 No 750 750
16. Water supply pipe, main bore making and connection 1 No. 2500 2500
17. Sanitary connection 1 No. 2000 2000
18. Construction of brick masonry inspection chambers 4” thick wall
and plastering
A)18”*18” 7 Nos 2800 19600
B)24”*24” 2 Nos 4000 8000
19. Earthwork excavation for PVC pipe laying in passage and inside building Lumpsum 12000 12000
20. Earthwork excavation for rain water harvest pit of 3 Feet dia, Lumpsum 15000 15000
10 Feet deep with precast RCC rings, covering the top with RCC slabs
and excess mud removing
21. Supply and fixing precast RCC manhole covers
A)18”*18” 7 Nos 950 6650
B)24”*24” 2 Nos 1400 2800
22. Supplying and fixing Gi Brackets with U clamps
A)6” 40 Nos 150 6000
B)12” 20 Nos 290 5800
23. Road cutting for water pipe and sewage pipeline (assuming the road width as 30’-0”, the charges will be 8000/- lump sum)
24. Fixing pressure pump 1 No 2500 2500
25. Bore well connection 1 No 2000 2000
26. Providing and fixing connector to take connections from sintex tank
A)1” 4 No 150 600
B)1 ¼” 6 Nos 200 1200
27. 110mm PVC pipe fixing for rain water 280 Rft 140 39200
28. Jindal composite pipe 1” 1 Rft 160 -----
29. Fixing wash basin 7 Nos 750 5250
30. Health faucet fixing 5 Nos 100 500
Note: BBMP road cutting deposits, road cutting charges and BWSSB deposits are extra-------------------------------------------------------------------
TOTAL Rs. 384850
Please help me with your input on the points that I can negotiate. This is for a full material contract including pipes, masonry for concelaed tank etc and excluding the final fittings and fixtures (such as WC, Wash basin, taps etc which has to be bought by me). This is for my upcoming house on 30x50 site with 5 bathrooms + 1 Kitchen. No borewell.
If you do have any reliable contacts for Plumbing, please do let me know.
Appreciate your inputs on this as this will help me decide on reasonable rates for this work.
Sl No. Description Unit Rate Amount
1 Supplying and fixing of CPVC pipes including all CPVC fittings like
Tees,Bends,unions,coupling,Reducers etc. Cutting, jointing with solvent
and pressure testing the joints and pipeline.
A)20mm 600 Rft 80 48000
B)25mm 700 Rft 90 63000
2. Supplying and fixing 1 CPVC ball valves with knob operated
A)20mm 4 Nos 450 1800
B)25mm 8 Nos 650 5200
3. Supplying and fixing of PVC soil waste and vent pipe and PVC fittings
A)75mm 140 Rft 120 16800
B)110mm 320 Rft 170 54400
4. Supplying and fixing of PVC nahni trap in concrete 22 Nos 450 9900
5. Fixing CP grating with rim 22 Nos 100 2200
6. Fixing geysers including the cost of making holes, required bolts 5 Nos 750 3750
and nuts with washers
7. Fixing wall mounted water closet with concealed Tank, 5 Nos 2500 12500
construction of brick masonry work and finishing
8. Hot and cold shower point providing and fixing mixer unit and 5 Nos 1250 7500
overhead shower
9. Fixing paper holder, soap dish. CP towel rack and others 15 Nos 100 1500
10. Making core cutting in RCC beams and slabs 15 Nos 600 9000
11. Concrete covering for PVC pipes in Bathrooms 90 cft 130 11700
12. Solar connection 1 No 2000 2000
13. Fixing Sump pump 1 No 2000 2000
14. Sintex tank fixing 1 No 2500 2500
15. Kitchen taps fixing 1 No 750 750
16. Water supply pipe, main bore making and connection 1 No. 2500 2500
17. Sanitary connection 1 No. 2000 2000
18. Construction of brick masonry inspection chambers 4” thick wall
and plastering
A)18”*18” 7 Nos 2800 19600
B)24”*24” 2 Nos 4000 8000
19. Earthwork excavation for PVC pipe laying in passage and inside building Lumpsum 12000 12000
20. Earthwork excavation for rain water harvest pit of 3 Feet dia, Lumpsum 15000 15000
10 Feet deep with precast RCC rings, covering the top with RCC slabs
and excess mud removing
21. Supply and fixing precast RCC manhole covers
A)18”*18” 7 Nos 950 6650
B)24”*24” 2 Nos 1400 2800
22. Supplying and fixing Gi Brackets with U clamps
A)6” 40 Nos 150 6000
B)12” 20 Nos 290 5800
23. Road cutting for water pipe and sewage pipeline (assuming the road width as 30’-0”, the charges will be 8000/- lump sum)
24. Fixing pressure pump 1 No 2500 2500
25. Bore well connection 1 No 2000 2000
26. Providing and fixing connector to take connections from sintex tank
A)1” 4 No 150 600
B)1 ¼” 6 Nos 200 1200
27. 110mm PVC pipe fixing for rain water 280 Rft 140 39200
28. Jindal composite pipe 1” 1 Rft 160 -----
29. Fixing wash basin 7 Nos 750 5250
30. Health faucet fixing 5 Nos 100 500
Note: BBMP road cutting deposits, road cutting charges and BWSSB deposits are extra-------------------------------------------------------------------
TOTAL Rs. 384850
Re: Please review: Plumbing Quotation
Sridhar,
After reading through your plumber's quote, I am thoroughly lost.
In general Plumber should charge about 10k per bathroom if you have floor mounted commodes. If concealed tank and wall hung ones are to be done, ththe charges can go upto 15k.
Please check quote from another plumber before proceeding
After reading through your plumber's quote, I am thoroughly lost.
In general Plumber should charge about 10k per bathroom if you have floor mounted commodes. If concealed tank and wall hung ones are to be done, ththe charges can go upto 15k.
Please check quote from another plumber before proceeding
-
- Posts: 21
- Joined: February 28th, 2014, 11:21 am
Re: Please review: Plumbing Quotation
Thanks Girish. Even I am lost completely. When you say 15k per bathroom, is it the labour cost of installing all pipes etc from sump to top, RWH, solar etc or only the labour pertaining to the bathroom. The quote given above is the cost of all pipes and labour etc excluding the final fittings for WC, taps, wash basin, fixtures etc.
Somehow I felt it was on a higher side. How did you get your house plumbing done? Did you get all the pipes, brackets and material etc? I am not sure how this is done and what will work out better?
Regards,
-Sridhar
Somehow I felt it was on a higher side. How did you get your house plumbing done? Did you get all the pipes, brackets and material etc? I am not sure how this is done and what will work out better?
Regards,
-Sridhar
Re: Please review: Plumbing Quotation
I have gone with labour contract and just finalized on the fixtures which by the way cost a bomb.
Yet to buy pipes and the laundry list of materials
My plumber is charging 15k each for 5 bathrooms and 10k each for two where we have floor mounted WC. Road cutting not included. Solar and kitchen will be charged depending on work involved
Yet to buy pipes and the laundry list of materials
My plumber is charging 15k each for 5 bathrooms and 10k each for two where we have floor mounted WC. Road cutting not included. Solar and kitchen will be charged depending on work involved
Re: Please review: Plumbing Quotation
I have gone with labour contract and just finalized on the fixtures which by the way cost a bomb.
Yet to buy pipes and the laundry list of materials
My plumber is charging 15k each for 5 bathrooms and 10k each for two where we have floor mounted WC. Road cutting not included. Solar and kitchen will be charged depending on work involved
Yet to buy pipes and the laundry list of materials
My plumber is charging 15k each for 5 bathrooms and 10k each for two where we have floor mounted WC. Road cutting not included. Solar and kitchen will be charged depending on work involved
-
- Posts: 21
- Joined: February 28th, 2014, 11:21 am
Re: Please review: Plumbing Quotation
Thanks Girish!
Re: Please review: Plumbing Quotation
Even , iam surprised with the cost given to you...10K per Bathroom is market stadard
please renegotaite with ur vendor
please renegotaite with ur vendor
-
- Posts: 52
- Joined: September 25th, 2013, 12:39 pm
Re: Please review: Plumbing Quotation
Above quote is toooo very costly.
My plumber is charging a 18K per floor (labor only) irrespective of no of bathroo or kitchen or any connection (like washbasin, washing machin point etc). This works out for me.
Vijay Thapa
My plumber is charging a 18K per floor (labor only) irrespective of no of bathroo or kitchen or any connection (like washbasin, washing machin point etc). This works out for me.
Vijay Thapa
-
- Posts: 21
- Joined: February 28th, 2014, 11:21 am
Re: Please review: Plumbing Quotation
Thanks for your inputs!
Regards,
-Sridhar
Regards,
-Sridhar
-
- Posts: 21
- Joined: February 28th, 2014, 11:21 am
Re: Please review: Plumbing Quotation
Friends,
I spoke to a couple of plumbers for labour contract and got a quote of 12K per bathroom and 5K for kitchen.
Now, I also hear from some acquaintances that plumbing is THE most important aspect in house construction and since I plan on installing concealed tanks etc to the bathrooms it is of utmost importance to catch hold of a reputed plumber to do this. How do I judge a Plumber's work? What do I need to check in order to make sure that he is an expert at his job and that I wont have any plumbing issues later?
You advise is most appreciated.
Regards,
I spoke to a couple of plumbers for labour contract and got a quote of 12K per bathroom and 5K for kitchen.
Now, I also hear from some acquaintances that plumbing is THE most important aspect in house construction and since I plan on installing concealed tanks etc to the bathrooms it is of utmost importance to catch hold of a reputed plumber to do this. How do I judge a Plumber's work? What do I need to check in order to make sure that he is an expert at his job and that I wont have any plumbing issues later?
You advise is most appreciated.
Regards,