Search found 72 matches
- March 8th, 2013, 1:43 am
- Forum: Civil Construction
- Topic: Electric meter panel board and cable
- Replies: 2
- Views: 3985
Electric meter panel board and cable
Hi, I purchased a meterbox panel board for my house but found that the boz was a little bigger than the space I have. So I am planning to sell it for lower price. Meter board specification: Length - 3 feet Height - 1' 6" feet Bus Bar - 8 inches It can accomodate 2 Three Phase meters / 2 Single Phase...
- March 8th, 2013, 1:09 am
- Forum: Civil Construction
- Topic: pillar plus foundation required ?
- Replies: 7
- Views: 10249
Re: pillar plus foundation required ?
Please do ask him to lay the foundation. Plinth tie should be above the foundation. Its all there for a reason. It is very important to get your structural plan done by Engg. Do not rely on contractor for this. A person [Your contractor] who tries to save labour and hesitates to put foundation right...
- March 8th, 2013, 12:38 am
- Forum: Civil Construction
- Topic: Electrical main meter board ...
- Replies: 1
- Views: 2918
Re: Electrical main meter board ...
Sent you an email. Kindly check.
- December 14th, 2012, 12:33 pm
- Forum: Civil Construction
- Topic: What is Sqft charge for granite/tiles?
- Replies: 27
- Views: 26510
Re: What is Sqft charge for granite/tiles?
sam per my knowledge, 20 for granite and 12 for wall tiles is a good. Ppl usually charge 24-25 for granite and 14 for wall tiles.
Im not sure abt nosing rates though..
Im not sure abt nosing rates though..
- December 13th, 2012, 8:15 pm
- Forum: Civil Construction
- Topic: Plumbing question
- Replies: 1
- Views: 2752
Plumbing question
What is the right way of connecting hot water from solar water heater and Geyser to shower mixer? My plumber says he would connect the hot water line from solar heater to Geyser and then connect Geyser to Shower mixer. Is this correct ? With this arrangement, Cold water from geyser has to be drained...
- December 13th, 2012, 7:55 pm
- Forum: Civil Construction
- Topic: Feedback on readymade door shutter from forest department
- Replies: 11
- Views: 11240
Re: Feedback on readymade door shutter from forest departmen
Im looking for the same info as well. Any insight on this will help me.
- December 9th, 2012, 1:00 am
- Forum: Civil Construction
- Topic: Solar Lights for Balcony (LED)
- Replies: 6
- Views: 7212
Re: Solar Lights for Balcony (LED)
You can fix an appointment with an executive from Anu Solar.. Executive will explain all the options available by visiting your place.
- November 30th, 2012, 8:40 pm
- Forum: Civil Construction
- Topic: Question reg electrical contract
- Replies: 4
- Views: 4844
Question reg electrical contract
My electrician has started charging me for all the groove cutting blades. Can you please tell me if I should be paying for all the groove cutting blades ?
- November 19th, 2012, 8:21 pm
- Forum: Civil Construction
- Topic: Looking for Tiles/Granite professional
- Replies: 8
- Views: 7793
Re: Looking for Tiles/Granite professional
Hi, What is the ongoing rates for granite/wall tile fixing ?
- October 9th, 2012, 6:39 pm
- Forum: Civil Construction
- Topic: Go for APCO blocks or Local blocks
- Replies: 4
- Views: 5226
Re: Go for APCO blocks or Local blocks
APCO is the preferred one.