Search found 20 matches

by girishkumarj
June 27th, 2015, 9:08 pm
Forum: Civil Construction
Topic: Labour contract rate
Replies: 7
Views: 8863

Re: Labour contract rate

Yes Labor cost is quoted is at higher side. Currently per sq ft 250 to 300 per sq ft. running. if we consider Modeling area, example in 30 x40 site you can go 950 sq ft as build up area max. 950 x 300rs is the labour cost and its up to you to build what so ever you want, if you go for chain staircas...
by girishkumarj
June 24th, 2015, 11:41 am
Forum: Civil Construction
Topic: Test building quality
Replies: 4
Views: 4890

Re: Test building quality

I dont think any agency can arrive at quality of constructions just by looking. During the time of construction you have to make sure right quality materials are used for the construction.

There is a company called Civil Aid who checks the quality of the material that is used and give us the report.
by girishkumarj
June 24th, 2015, 11:28 am
Forum: Civil Construction
Topic: Need guidance on Gas pipe line to kitchen
Replies: 9
Views: 11691

Re: Need guidance on Gas pipe line to kitchen

Hi,
When we take it through a long run pipe definitely there will be gas lose, To keep gas lose less then 1/2 kgs. run the horizontal pipe limited to 20 fts and vertical by 10 fts.
Make sure you have good copper piping along with a ISI valve to control it.


Regards
Girish.
by girishkumarj
June 23rd, 2015, 1:58 pm
Forum: Civil Construction
Topic: Electrical Switches
Replies: 20
Views: 18782

Re: Electrical Switches

Hi,

Anchor Roma is a good Model switches, but these cheap builders and buy Ancor roma plate only and put lowest verity of Anchor switches rider model verities. Make sure you have Roma switchs or Rider switches.

Regards
Girish.
by girishkumarj
June 23rd, 2015, 1:47 pm
Forum: Civil Construction
Topic: Need guidance on Gas pipe line to kitchen
Replies: 9
Views: 11691

Re: Need guidance on Gas pipe line to kitchen

Hi,
Gas piping from ground floor to 2nd Floor is not recommended. There will be gas lose of up 2 kgs / cylinder which is 14kgs.
Its a National waste,
Please run the gas piping floor by floor.

Regards
Girish.
by girishkumarj
October 8th, 2012, 10:43 pm
Forum: Civil Construction
Topic: Go for APCO blocks or Local blocks
Replies: 4
Views: 5202

Go for APCO blocks or Local blocks

Hi All, Today i have inquired about the APCO block 6" e grade and landing cost at site works to be Rs 39 per block (including of VAT +deliver charges + discounts) and waiting period is 7 days. If we go for Local blocks 6" (rough finishing) its landing cost is Rs 25 (inclusive of every thing) Local g...
by girishkumarj
October 7th, 2012, 9:52 pm
Forum: Civil Construction
Topic: submerssible or compressor Motor for borewell
Replies: 3
Views: 3906

Re: submerssible or compressor Motor for borewell

I have a question on Borewell motor starter, Electic starter ==> L & T , Shanthi and few more brands are avalible but (dry run mode is not there, dry run mode means if water is not there then bore motor will shut off ) Electronic Starter ==> elco and Gelco starter are available with dry run mode. Wh...
by girishkumarj
October 6th, 2012, 7:28 pm
Forum: Civil Construction
Topic: Cost of Temperory Electrical connection for Construction
Replies: 30
Views: 28675

Re: Cost of Temperory Electrical connection for Construction

Sam_m400,

Thanks for correcting, yes its for 28 days, 22k is a correct price or over priced.
by girishkumarj
October 6th, 2012, 7:10 pm
Forum: Civil Construction
Topic: Skylight work
Replies: 27
Views: 22116

Re: Skylight work

skywork.png
skywork.png (474.6 KiB) Viewed 7483 times
Do Some have a skylight work done as show in the picture below, through my friend i have got this picture and i dont know how about the security, does its a tuf glass
comments are welcomed for this picture
by girishkumarj
October 6th, 2012, 2:55 pm
Forum: Civil Construction
Topic: Borewell dilemma
Replies: 76
Views: 57534

Re: Borewell dilemma

Hi All, very recently we did a bore and the depth is 727 ft , good water 2+ " , For motor installation people suggest 5hp 3 phase 36 stage Texmo submer pump. planned to place the bore motor at 700ft depth + high of the building ~44fts. An alternative suggestion kindly share the thought. Planned for ...