Hi,
Please check Veneeza Cucine.The designs are lot and they do as per your requirements. The quality of work is very good.
Contact Toji - 09972372573
rgds
Swamy
Search found 154 matches
- May 13th, 2019, 10:55 pm
- Forum: Interiors
- Topic: Interior carpenter labor prices
- Replies: 21
- Views: 63130
- April 3rd, 2019, 10:39 pm
- Forum: Civil Construction
- Topic: Cement and steel cost optimizations
- Replies: 5
- Views: 5649
Re: Cement and steel cost optimizations
Hi, For Footing and Pillar always go with JSW for peace of mind, never compromise for this. Cement also go with Birla Super/Ultratech for Footing, pillar and RCC, for Plastering go with Bharati. For G+3 building for 30×50 site the quantity required is approximately 12-14 tons, going with lower brand...
- January 23rd, 2019, 7:11 am
- Forum: Civil Construction
- Topic: Cost of Temporary shed
- Replies: 1
- Views: 3261
Re: Cost of Temporary shed
Hi, To construct the temporary shed, the cost would be - 1) Cement blocks - 500 nos @ Rs 30-35 = 15000 2) Cement Bags - Penna/Nagarjuna = 5 bags @ Rs 300 = 1500 3) Cement sheets 12 feet length = 5 Nos @ 600-700 per sheet = 3500 4) Temporary door 2 Nos = 4000 5) Labour/Masan charges for Shed = 10000 ...
- December 29th, 2018, 7:57 pm
- Forum: Civil Construction
- Topic: PAINTER
- Replies: 4
- Views: 6205
Re: PAINTER
Hi,
If you want the reference of Painter then please check this guy Sangam - 9945623508
He charges based on per sqft basis walls Interior 12 Rs, exterior wall 8 Rs, Teakwood 100 per sqft and enamel painting 8 per sqft and running feet.
rgds
Swamy
If you want the reference of Painter then please check this guy Sangam - 9945623508
He charges based on per sqft basis walls Interior 12 Rs, exterior wall 8 Rs, Teakwood 100 per sqft and enamel painting 8 per sqft and running feet.
rgds
Swamy
- December 29th, 2018, 7:52 pm
- Forum: Civil Construction
- Topic: Builder delaying house construction
- Replies: 6
- Views: 7479
Re: Builder delaying house construction
Hi, Very sad to hear your status, not sure what is your agreement with your contractor on completion and payment schedule. Usually in material contract the payment schedule is based on milestone like work completion - Advance - Foundation- walls - RCC(floor wise)- plastering etc... Since you mention...
- December 29th, 2018, 7:30 pm
- Forum: Civil Construction
- Topic: Good Carpenters for interiors
- Replies: 5
- Views: 5940
Re: Good Carpenters for interiors
Hi, I recommend the interiors to be done with Factory finish one instead of manual work, the price would be little high but looks, fitment, finish will always be very good. In the manual carpentry work its time consuming, damage to floor and walls, sound, dusty environment and finish is not uniform....
- December 29th, 2018, 7:21 pm
- Forum: Civil Construction
- Topic: Little things we forget while planning
- Replies: 27
- Views: 26770
Re: Little things we forget while planning
Hi
Always consider a width of 7 feet and Length of 16 feet for 1 car (Innova) so for Maruti Alto the length could be 12 feet.
So for 2 cars it will be 12 x 14 feet for maruti alto
rgds
Swamy
Always consider a width of 7 feet and Length of 16 feet for 1 car (Innova) so for Maruti Alto the length could be 12 feet.
So for 2 cars it will be 12 x 14 feet for maruti alto
rgds
Swamy
- November 13th, 2018, 2:37 pm
- Forum: Interiors
- Topic: Interior carpenter labor prices
- Replies: 21
- Views: 63130
Re: Interior carpenter labor prices
Hi, The Price quoted is very high.Usual Labour Charges for Wardrobe = 240-250/sqft, Loft = 180-200/Sqft, Kitchen = 275/Sqft, Panelling = 180/Sqft, I suggest you go with Factory Finish Interiors, The Factory finish compared to Manual work is top class. Just go with reputed firm. Even if you invest ad...
- October 3rd, 2018, 8:21 pm
- Forum: Civil Construction
- Topic: Went Bathroom shopping Day 1
- Replies: 17
- Views: 17347
Re: Went Bathroom shopping Day 1
Hi Guys, I always prefer Jaquar or Hindware brands for any Sanitary Wares. Jaquar is famous for Taps, Showers and other fittings Jaquar/Hindware for Commodes, wash basins. They also have very good designs and a quality product and during replacement also they are easily available. Visit once the Jaq...
- October 3rd, 2018, 8:14 pm
- Forum: Civil Construction
- Topic: JCB costs
- Replies: 2
- Views: 3779
Re: JCB costs
Hi,
Usually the JCB guys charges around Rs 700-800 per hour but they ask for minimum 3 hours work means Rs 2100 - 2400.
rgds
Swamy
Usually the JCB guys charges around Rs 700-800 per hour but they ask for minimum 3 hours work means Rs 2100 - 2400.
rgds
Swamy