Search found 37 matches
- January 9th, 2015, 11:46 am
- Forum: Civil Construction
- Topic: CLARIFICATION......
- Replies: 10
- Views: 11788
Re: CLARIFICATION......
Thank you nagzzz and msananthu for more info.
- January 4th, 2015, 5:27 am
- Forum: Civil Construction
- Topic: CLARIFICATION......
- Replies: 10
- Views: 11788
Re: CLARIFICATION......
Girishd: Thank you for the details. Will check with Maruthi Ceramics.
Right now plastering is going on. By end of January need to finalize on the tiles. will check Simpolo tiles.
thanks again.
Right now plastering is going on. By end of January need to finalize on the tiles. will check Simpolo tiles.
thanks again.
- January 4th, 2015, 5:27 am
- Forum: Civil Construction
- Topic: CLARIFICATION......
- Replies: 10
- Views: 11788
Re: CLARIFICATION......
Girishd: Thank you for the details. Will check with Maruthi Ceramics.
Right now plastering is going on. By end of January need to finalize on the tiles. will check Simpolo tiles.
thanks again.
Right now plastering is going on. By end of January need to finalize on the tiles. will check Simpolo tiles.
thanks again.
- December 31st, 2014, 10:26 am
- Forum: Civil Construction
- Topic: CLARIFICATION......
- Replies: 10
- Views: 11788
Re: CLARIFICATION......
Thanks for the clarification. Will talk to contractor.
Girishd: I am also looking for white vitrified tile. Let me know the rates when you finally decide on it.
I like these designs of these tiles:
nu Statuario (white) 800x800 mm
600 x 600 mm
Odc Statuario
Glacier white
Crystal Bianco
I have ...
Girishd: I am also looking for white vitrified tile. Let me know the rates when you finally decide on it.
I like these designs of these tiles:
nu Statuario (white) 800x800 mm
600 x 600 mm
Odc Statuario
Glacier white
Crystal Bianco
I have ...
- December 25th, 2014, 1:45 pm
- Forum: Civil Construction
- Topic: CLARIFICATION......
- Replies: 10
- Views: 11788
CLARIFICATION......
Hi Friends
I need clarification regarding this issue.
The labour contractor is charging per chadra 27,000 (only labour cost).
He is calculating the same for the stilt parking.
My question is :
Even though the stilt parking does not have walls and no plastering why does he charge still per ...
I need clarification regarding this issue.
The labour contractor is charging per chadra 27,000 (only labour cost).
He is calculating the same for the stilt parking.
My question is :
Even though the stilt parking does not have walls and no plastering why does he charge still per ...
- December 22nd, 2014, 10:46 am
- Forum: Civil Construction
- Topic: GAS/CYCLINDER CONNECTION.....
- Replies: 9
- Views: 11352
Re: GAS/CYCLINDER CONNECTION.....
When I spoke to the installer. He said there is no drop in gas pressure.
I think if someone has installed in the ground floor, their comments/suggestions will be great help.
I think if someone has installed in the ground floor, their comments/suggestions will be great help.
- December 20th, 2014, 12:21 pm
- Forum: Civil Construction
- Topic: GAS/CYCLINDER CONNECTION.....
- Replies: 9
- Views: 11352
Re: GAS/CYCLINDER CONNECTION.....
Hi Girishd,
Thanks for the inputs.
I got the below reference from justdial. I spoke with him just now. He says most of the new homes which are built nowadays prefer to keep it in parking area/common area.
I am confused at present. Will check up with the reference from the link.
For reference ...
Thanks for the inputs.
I got the below reference from justdial. I spoke with him just now. He says most of the new homes which are built nowadays prefer to keep it in parking area/common area.
I am confused at present. Will check up with the reference from the link.
For reference ...
- December 19th, 2014, 12:25 pm
- Forum: Civil Construction
- Topic: GAS/CYCLINDER CONNECTION.....
- Replies: 9
- Views: 11352
GAS/CYCLINDER CONNECTION.....
Hi Friends,
Here is the scenario of the building: That ground floor is stilt parking (parking with space for lift and staircase) and first floor 2 bhk home and second floor one bedroom two homes. Up to now, we have built this much. Later stage we will build duplex house on third and fourth floor ...
Here is the scenario of the building: That ground floor is stilt parking (parking with space for lift and staircase) and first floor 2 bhk home and second floor one bedroom two homes. Up to now, we have built this much. Later stage we will build duplex house on third and fourth floor ...
- November 26th, 2014, 12:03 am
- Forum: Civil Construction
- Topic: Bricks for construction
- Replies: 21
- Views: 26602
Re: Bricks for construction
Hi Ramki,
sorry for the delay in my reply.
The brick vendor phone number is
9141895204
Regards
pooja
sorry for the delay in my reply.
The brick vendor phone number is
9141895204
Regards
pooja
- November 21st, 2014, 11:25 am
- Forum: Civil Construction
- Topic: Bricks for construction
- Replies: 21
- Views: 26602
Re: Bricks for construction
Hi,
We are using normal red bricks. One piece is costing Rs 5.50 ( five rupees 50 paise). I hope others can give more details on wire cut bricks.
Check www.btiles.com (Bangalore tile company). The prices they quote are really expensive. If you check some companies from Malur side(Kolar) they have ...
We are using normal red bricks. One piece is costing Rs 5.50 ( five rupees 50 paise). I hope others can give more details on wire cut bricks.
Check www.btiles.com (Bangalore tile company). The prices they quote are really expensive. If you check some companies from Malur side(Kolar) they have ...