Search found 10 matches
- January 12th, 2015, 4:44 pm
- Forum: Civil Construction
- Topic: Concrete Overhead tank leakage problem
- Replies: 1
- Views: 2561
Concrete Overhead tank leakage problem
Hi Everyone, Newly constructed Overhead tank with a size of 4feet*4feet is in trouble. Leakage is at tank corner points. water comes out of the tank when we fill the tank. We constructed two tanks and on tank dimension is 4 feet lengthx4 widthx2.5 height and One tank capacity is 1000 litres. In one ...
- January 12th, 2015, 4:06 pm
- Forum: Civil Construction
- Topic: Vastu Suggestion / Remedy
- Replies: 4
- Views: 4421
Re: Vastu Suggestion / Remedy
As per your text, I think the house facing is west. you can close with u-pvc glass window. Thats fine.
Sump details I can not get you. send a plan of your home to understand what is what.
Point No 3 is okay. Its not a problem.
Sump details I can not get you. send a plan of your home to understand what is what.
Point No 3 is okay. Its not a problem.
- June 30th, 2014, 8:52 am
- Forum: Construction material group buying
- Topic: Group buy - UPVC window
- Replies: 30
- Views: 52356
Re: Group buy - UPVC window
Hi balaji,
I am constructing home at Coimbatore....
I am constructing home at Coimbatore....
- June 27th, 2014, 1:57 pm
- Forum: Construction material group buying
- Topic: Group buy - UPVC window
- Replies: 30
- Views: 52356
Re: Group buy - UPVC window
I am also confused with uPvc windows & doors. Many brands coming in to the market. I could not find the quality product. some one quoted 250/sq.ft and some one quoted 750/sq.ft. LG Hausys- 400/sq.ft sliding type & 500/sq.ft open type Fenesta - 650/Sq.ft sliding type & 750/sq.ft open type Little conf...
- June 25th, 2014, 5:23 pm
- Forum: Civil Construction
- Topic: Need help on Stair case position
- Replies: 3
- Views: 3910
Re: Need help on Stair case position
Send the full residential plan. the attached pdf is not clear. As per vaastu staircase should be placed in northwest direction. which means that first step should be in south or east end. Also, total number of steps should be in odd number. The pdf shows correct direction. do not worry. send the ful...
- May 16th, 2014, 8:53 am
- Forum: Civil Construction
- Topic: Urgent comments required for choosing submersible waterpump
- Replies: 0
- Views: 1882
Urgent comments required for choosing submersible waterpump
For my home C.R.I submersible Water pump required for 110 feet deep bore well. I am having confusion in choosing pump. Lot of things in choosing bore well. I could not able to understand the concept of discharge (LPS) and no of heads (feet). Also water/oil based motor available. What is STAGE? Pleas...
- May 15th, 2014, 5:37 pm
- Forum: Civil Construction
- Topic: Need advice for first floor plan
- Replies: 5
- Views: 5164
Re: Need advice for first floor plan
Dear mcneha, Thanks for your suggestions. I am planing to place Pooja room near to SOUTH-WEST corner with the dimension of 6x4 in west side wall (Just placing shelf). 4 seat sitting arrangement is possible at hall near to east facing window. Dear ravindra kumar hg, Thanks for your suggestions. As yo...
- May 15th, 2014, 9:43 am
- Forum: Civil Construction
- Topic: Need advice for first floor plan
- Replies: 5
- Views: 5164
Re: Need advice for first floor plan
Please give an idea for pooja room.
- May 14th, 2014, 3:32 pm
- Forum: Civil Construction
- Topic: Need advice for first floor plan
- Replies: 5
- Views: 5164
Need advice for first floor plan
Any Advisable changes!!!!!
East facing house [55x24=1320 sq.ft]
Hall 16'9" x 16' 9"
Master bedroom 11'3" x 16' 0"
Kitchen 8'3" x 9' 9"
Bedroom 8'0" x 9' 9"
Pooja 3x4
Bathroom 5x8
Please give suggestion for this plan
East facing house [55x24=1320 sq.ft]
Hall 16'9" x 16' 9"
Master bedroom 11'3" x 16' 0"
Kitchen 8'3" x 9' 9"
Bedroom 8'0" x 9' 9"
Pooja 3x4
Bathroom 5x8
Please give suggestion for this plan
- April 26th, 2014, 11:51 pm
- Forum: Civil Construction
- Topic: Whats the Construction cost per Sq/ft now?
- Replies: 9
- Views: 14298
Re: Whats the Construction cost per Sq/ft now?
Cost calculation for 1200 Sq.Ft construction work Calculation based on the following data: Cubic Meter= 35.31Cubic feet 1 unit of sand= 100 cubic feet Brick work: Cement: Sand = 1:2 (or) 1:1.5 1 CUBIC METRE REQUIRES 1.4 BAGS OF CEMENT; 0.299 CUBIC METRE SAND; & 500 BRICKS Solution for Brick work: To...