Better your Architect and Structural Engineer see the cracks and advise. As already posted by other members cracks may occur because of number of reasons.
Search found 23 matches
- June 28th, 2016, 8:12 pm
- Forum: Civil Construction
- Topic: NEW building developed A lot of cracks! need advice PLEASE VERY WORRIED!!!
- Replies: 18
- Views: 19220
- June 28th, 2016, 7:53 pm
- Forum: Material prices
- Topic: BOREWELL PUMP INSTALLATION COST
- Replies: 32
- Views: 38365
Reg: Bore well pump problem
Dear members, I have installed a 3HP 40 stage taro 4 inch texmo industries three ph pump for drawing water from a depth of around 1000 ft. Other accessories and fittings are 1 1/4 HDPE 16 kgcm mangalam pipe(240 metres), 2.5 sqmm V-Guard cable and 3 HP starter. Installation was during February 2014. ...
- October 7th, 2014, 10:48 am
- Forum: Civil Construction
- Topic: Cement wardrobes and kitchen shelves
- Replies: 8
- Views: 10460
Re: Cement wardrobes and kitchen shelves
Dear friends, Can any body share about cement kitchen shelves and cement ward robes? The cost of Rs.85/- per sq ft (inccluding fitting) for cement shelves and Rs.500/- per sq ft for wooden shutters to the cement shelves is reasonable?. The materials used are: Green Ply 19mm, two sides lamination, st...
- July 20th, 2014, 7:15 pm
- Forum: General
- Topic: Akrama Sakrama Vs Betterment Charges:- Helping Info Required
- Replies: 6
- Views: 8515
Re: Akrama Sakrama Vs Betterment Charges:- Helping Info Requ
Dear alll, What I understood from various sources is as follows: 1. The betterment charges (once they start collecting) is applicable for the site dimensions. 2. The charges are payable irrespective of whether you have constructed or not. 3. The betterment charges what they have announced are applic...
- July 20th, 2014, 7:09 pm
- Forum: Urban Planning
- Topic: BETTERMENT CHARGES
- Replies: 10
- Views: 29097
Re: BETTERMENT CHARGES
Dear Avinash, What I understood from various sources is as follows: 1. The betterment charges (once they start collecting) is applicable for the site dimensions. 2. The charges are payable irrespective of whether you have constructed or not. 3. The betterment charges what they have announced are app...
- July 8th, 2014, 7:42 pm
- Forum: Urban Planning
- Topic: BETTERMENT CHARGES
- Replies: 10
- Views: 29097
Re: BETTERMENT CHARGES
dear msn1270,
Is there any latest update on betterment charge?
Is there any latest update on betterment charge?
- June 17th, 2014, 7:45 pm
- Forum: General
- Topic: RESULT OF COMPRESSION STRENGTH FOR SLAB CASTING WITH RMC
- Replies: 4
- Views: 4559
Re: RESULT OF COMPRESSION STRENGTH FOR SLAB CASTING WITH RMC
Mr.Chandrasekhar,
In continuation to the above, I would like to say that the compression test of 28th day gave a result of 30 which appear to be in accordance with M25 expectation, which means curing after 7th day to 28 th day has shown improvement in strength?
In continuation to the above, I would like to say that the compression test of 28th day gave a result of 30 which appear to be in accordance with M25 expectation, which means curing after 7th day to 28 th day has shown improvement in strength?
- June 1st, 2014, 1:05 pm
- Forum: General
- Topic: RESULT OF COMPRESSION STRENGTH FOR SLAB CASTING WITH RMC
- Replies: 4
- Views: 4559
Re: RESULT OF COMPRESSION STRENGTH FOR SLAB CASTING WITH RMC
Dear Chandrasekhar, The cube casting done properly. In fact there were four batches of supply. Only first three batches samples (two each) were taken. The supply size batch wise is 9, 7,9,7 (total 32 cmt). The grade was M25. The RMC Supplier is CI Concrete India Private Ltd. I was told by Civil Aid ...
- May 30th, 2014, 3:51 pm
- Forum: General
- Topic: RESULT OF COMPRESSION STRENGTH FOR SLAB CASTING WITH RMC
- Replies: 4
- Views: 4559
RESULT OF COMPRESSION STRENGTH FOR SLAB CASTING WITH RMC
HI FRIENDS, The Compression strength result after 7 th day of casting slab gives 13.2 (against 17 for M25 grade concrete.) Curing is still going on and another set of samples will be tested on 28th day. What are the precautions to be taken for that particular portion of slab where the M25 grade spre...
- March 18th, 2014, 6:53 pm
- Forum: Urban Planning
- Topic: BETTERMENT CHARGES
- Replies: 10
- Views: 29097
Re: BETTERMENT CHARGES
Dear msn1270,
is there any latest update on payment of betterment charge? I heard that they have already announced and we can pay?
is there any latest update on payment of betterment charge? I heard that they have already announced and we can pay?